Loading
Loading
Your feedback directly shapes Sporos.
Sign in to track your feedback history
Browse 6 rules and proposed rules from the Federal Register.
6
Total Regulations
Showing 1–6 of 6
The U.S. Environmental Protection Agency (the EPA or Agency) is issuing a notice to correct some of the deadlines listed in the final rule, "Effluent Limitations Guidelines and Standards for the Steam Electric Generating Point Source Category-- Deadline Extensions," which published in the Federal Register on December 31, 2025. After publication, the EPA became aware of post- signature typographical errors in the published regulatory text concerning compliance deadlines for pretreatment standards and related reporting recordkeeping requirements in the rule. This correction will ensure that the rule's compliance deadlines and reporting and recordkeeping deadlines match those in the version of the rule signed by the EPA Administrator.
The U.S. Environmental Protection Agency (the EPA or Agency) is finalizing a Clean Water Act (CWA) rule to extend deadlines promulgated in the 2024 "Supplemental Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category" (2024 rule), update the 2024 rule's transfer provisions to allow facilities to switch between compliance alternatives, and create authority for alternative applicability dates and paperwork submission dates, based on site-specific factors.
Because the U.S. Environmental Protection Agency (EPA) received adverse comment, it is withdrawing the direct final rule entitled, "Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category--Initial Notification Date Extension," published in the Federal Register on October 2, 2025.
The U.S. Environmental Protection Agency (the EPA or Agency) is proposing a Clean Water Act (CWA) rule to extend deadlines, promulgated in the 2024 "Supplemental Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category" (2024 rule), update the transfer provisions to allow facilities to switch between compliance alternatives, and create authority for an alternative applicability dates and paperwork submission dates, based on site-specific factors. The EPA is also seeking comment on several issues relevant to a separate, future rulemaking on the underlying standards.
The U.S. Environmental Protection Agency (the EPA or Agency) is taking direct final action to extend the date for existing steam electric power plants to decide whether to submit a notice of planned participation (NOPP) for the permanent cessation of coal combustion subcategory in the 2024 Supplemental Steam Electric Reconsideration Rule ("2024 rule").
This document delays until March 20, 2025, the effective date of the December 20, 2024, final rule that adopted Federal Motor Vehicle Safety Standard (FMVSS) No. 305a to replace FMVSS No. 305, "Electric- powered vehicles: Electrolyte spillage and electrical shock protection." FMVSS No. 305a applies to light and heavy vehicles and includes performance requirements for the propulsion battery. The final rule also established a part entitled, "Documentation for Electric- powered Vehicles," that requires manufacturers to compile risk mitigation documentation and submit standardized emergency response information to assist first and second responders handling electric vehicles.