Loading
Loading
Your feedback directly shapes Sporos.
Sign in to track your feedback history
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Little River Bridge, across the Atlantic Intracoastal Waterway (AICW), mile 347.3, at North Myrtle Beach, SC. South Carolina Department of Transportation (SCDOT) requested the Coast Guard consider placing the swing bridge on weekday scheduled openings at designated times to assist with vehicle congestion. This deviation will test a change to the drawbridge operation schedule to determine whether a permanent change to the schedule is needed. The Coast Guard is seeking comments from the public regarding these changes.
Published
May 13, 2025
Effective
May 13, 2025
Citation
90 FR 20235
Agencies
2
Full text not available in our database.
View on Federal Register →Get a plain-English explanation of what this regulation does, which agencies are responsible, and how it affects existing rules.
No document text available yet
Docket No. USCG-2025-0152
33 CFR 117