Loading
Loading
Your feedback directly shapes Sporos.
Sign in to track your feedback history
The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 4 to Regulatory Guide (RG) 1.32, "Criteria for Power Systems for Nuclear Power Plants," and new RG 1.238, "Criteria for the Protection of Class 1E Power Systems and Equipment for Nuclear Power Plants." RG 1.32, Revision 4, describes an acceptable approach for use in complying with NRC regulations for the design, operation, and testing of electric power systems in nuclear power plants. RG 1.238 describes an acceptable approach for use in complying with NRC regulations for protection of Class 1E power systems and equipment at nuclear power plants. The NRC is also withdrawing RG 1.41, "Preoperational Testing of Redundant On-Site Electric Power Systems to Verify Proper Load Group Assignments," since its guidance is incorporated into RG 1.32, Revision 4.
Published
Jan 31, 2025
Citation
90 FR 8655
Agencies
1
Full text not available in our database.
View on Federal Register →Get a plain-English explanation of what this regulation does, which agencies are responsible, and how it affects existing rules.
No document text available yet
NRC-2024-0140
10 CFR 50
10 CFR 52