Loading
Loading
Your feedback directly shapes Sporos.
Sign in to track your feedback history
The Coast Guard is removing the existing drawbridge operation regulation for the Causton Bluff, SR 26, Bridge across the Atlantic Intracoastal Waterway, mile 579.9, near Causton Bluff, GA. The drawbridge was replaced with a fixed bridge and the bascule span leaves have been removed from the structure. The operating regulation is no longer applicable or necessary.
Published
Dec 15, 2023
Effective
Dec 15, 2023
Citation
88 FR 86822
Agencies
2
Full text not available in our database.
View on Federal Register →Get a plain-English explanation of what this regulation does, which agencies are responsible, and how it affects existing rules.
No document text available yet
Docket No. USCG-2023-0814
1625-AA09
33 CFR 117