Loading
Loading
Your feedback directly shapes Sporos.
Sign in to track your feedback history
Permit applications for natural gas pipelines; State Water Control Law. Requires applicants for federal licenses or permits for natural gas transmission pipelines with an inside diameter of at least 24 inches to submit a separate application, erosion and sediment control plan, and stormwater management plan to the Department of Environmental Quality concurrently with a Joint Permit Application. Current law requires such application standards for pipelines with an inside diameter of greater than 36 inches. The provisions of the bill apply to any natural gas transmission pipeline project of at least 24 inches in inside diameter that is subject to a certificate of public convenience and necessity under the federal Natural Gas Act and that has not commenced construction by July 1, 2024, notwithstanding any previous certification previously issued or waived by the Department of Environmental Quality or the State Water Control Board.
Introduced
Jan 8, 2024
Last Action
Nov 18, 2024
Session
VA 2025
Sponsors
1 primary · 6 co
Left in Agriculture, Chesapeake and Natural Resources
Continued to 2025 in Agriculture, Chesapeake and Natural Resources (Voice Vote)
Impact statement from DPB (HB524)
Subcommittee recommends continuing to 2025 (Voice Vote)
Assigned ACNR sub: Chesapeake
Prefiled and ordered printed; offered 01/10/24 24103688D
Referred to Committee on Agriculture, Chesapeake and Natural Resources
AI summaries for state legislation will be available once full text is ingested. Bill text for this state is being collected.
Left in Agriculture, Chesapeake and Natural Resources
Amy J. Laufer