Loading
Loading
Your feedback directly shapes Sporos.
Sign in to track your feedback history
Requires the public utilities commission (PUC) to produce a report by January 1, 2026 and each January 1 thereafter, on the ability for the current electric grid to handle the electrification load need to power cars, buildings, and heating of homes.
Introduced
Feb 26, 2025
Last Action
Apr 8, 2025
Session
RI 2025
Sponsors
4 primary · 0 co
04/08/2025 Committee recommended measure be held for further study
04/04/2025 Scheduled for hearing and/or consideration (04/08/2025)
02/26/2025 Introduced, referred to Senate Commerce
Get a plain-English explanation of what this bill does, who it affects, and why it matters.
04/08/2025 Committee recommended measure be held for further study