Loading
Loading
Your feedback directly shapes Sporos.
Sign in to track your feedback history
Requires the division of statewide planning coordinate a wastewater capacity study to evaluate the capacity, flows, physical conditions, regulatory compliance and vulnerabilities to natural hazards of publicly/privately owned wastewater infrastructure.
Introduced
Jan 30, 2026
Last Action
Feb 26, 2026
Session
RI 2026
Sponsors
10 primary · 0 co
02/26/2026 Committee recommended measure be held for further study
02/19/2026 Scheduled for hearing and/or consideration (02/26/2026)
01/30/2026 Introduced, referred to House Environment and Natural Resources