Loading
Loading
Your feedback directly shapes Sporos.
Sign in to track your feedback history
Allows preferred sites to be developed without being subject to the cap or rate reduction in the net metering statute.
Introduced
Mar 14, 2025
Last Action
Apr 1, 2025
Session
RI 2025
Sponsors
2 primary · 0 co
04/01/2025 Committee recommended measure be held for further study
03/28/2025 Scheduled for hearing and/or consideration (04/01/2025)
03/14/2025 Introduced, referred to House Corporations