Loading
Loading
Your feedback directly shapes Sporos.
Sign in to track your feedback history
Caps the minimum lot size that may be required to not exceed three (3) new separate parameters relating to the availability of public water, sewer, and transit.
Introduced
Feb 28, 2025
Last Action
Apr 10, 2025
Session
RI 2025
Sponsors
6 primary · 0 co
04/10/2025 Committee recommended measure be held for further study
04/04/2025 Scheduled for hearing and/or consideration (04/10/2025)
02/28/2025 Introduced, referred to House Municipal Government & Housing